Water Well Drilling Tools is an important tool for the exploration and development of oil and gas resources in the oil and gas industry. It has gradually been widely used. Among them, the Water Well Drilling Tools connector is used to connect the upper and lower drill pipes during oil drilling. Working torque is the weak link of oil drill pipes. Some matters need to be paid attention to when using oil drill pipes. Only in this way can it be better used.
Precautions for the use of oil drill pipes: Avoid using a vise to hold any part of the drill pipe body to prevent the rod body from being injured by slips. Luohe drill pipe will reduce the service life of the drill pipe. Use qualified zinc-based rib grease. Butter is not suitable for use as thread oil. Insufficient thread grease will cause high spots on the shoulder of the joint. Petroleum drill pipes will easily "loose" the threaded connection and cause the thread to be damaged. Do not use thread grease or use unqualified thread grease, which will cause the surface of the thread to stick and cause the phenomenon of sticking.
- Drill pipes should be maintained regularly, and the maintenance cycle should be determined according to the use environment and air humidity. Anti-rust and oiling and dust-proof treatment should be carried out on a regular basis.
- The use of drill rods should be within the rated drilling distance of the drilling rig. According to the technical parameters of the drilling distance and the drilling rig model, select the matching drill rods.
- Our company produces a series of products such as cable anchor rod, anchor rod drill rod, pneumatic drill rod, in-line finished drill, and cross finished drill. The rod body uses 55SiMnMo and 90CrMo high-quality hexagonal hollow alloy steel as raw materials. The products are subjected to high pressure Forging, vacuum overall quenching and tempering heat treatment. The application of CNC automation equipment for processing and shaping ensures stable and reliable product quality. Products are widely used in mine tunnel support drilling, mine rock drilling, coal mine rock tunnels, bridge tunnels and other engineering constructions. In engineering construction such as mine tunnel support drilling, mine rock mining, coal mine rock tunnels, bridge tunnel excavation, or other special environment operations, it is necessary to determine the reasonable drilling depth according to the actual material, physical properties and parameters of the drill pipe.
- When the drill pipe and the drill bit are used together, the drill bit should be larger than the diameter of the drill pipe under normal circumstances, and the condition of the drill rig and the drill pipe should always be paid attention to during the drilling process. In the event of stuck-in, locked-up, etc., stop drilling immediately or drill back slowly to ensure that the drill pipe does not bend or deform.
- When the drill pipe is ventilated or through water, make sure that the drill pipe is tightly connected when drilling. When the drill pipe has seals, such as O-rings, pay attention to the use of the seals. In the event of damage, corrosion, etc., the seals should be replaced in time. After the drilling is completed, the seals are maintained and cleaned.
- The Rock Button Bits should be manually connected correctly when drilling to ensure a close fit. The drilling rig cannot be used to directly drill into the geology. How to maintain the geological drill pipe to prevent damage to the drill pipe